The Project
Our Charge
Based on a professional architectural assessment completed in March 2023 by Barba + Wheelock, the UMaine ATO House requires 1M-$1.4M of investment over the next 5-10 years to maintain into the future.
The House has stood strong for nearly a century, but time and the elements have taken their toll. In order to preserve our historic home and ensure it remains a safe, welcoming place for future generations, we must address critical repairs and upgrades. Our comprehensive project plan focuses on protecting the structural integrity of the building, improving safety, and investing in the spaces that make the House the heart of Beta Upsilon. Below is a breakdown of the costs and phases necessary to bring this vision to life.
| Interior vs. Exterior | Urgency | Items Requiring Attention | Minimum Cost | Maximum Cost |
|---|---|---|---|---|
| Exterior | Short Term | 9 | $702,000 | $825,000 |
| Ongoing Maintenance | 1 | $5,000 | $10,000 | |
| Medium Term | 9 | $177,000 | $175,000 | |
| Long Term | 4 | $97,000 | $285,000 | |
| Exterior Total | 23 | $981,000 | $1,295,000 | |
| Interior | Short Term | 4 | $14,500 | $24,500 |
| Medium Term | 4 | $19,000 | $92,000 | |
| Long Term | 1 | $5,000 | $5,000 | |
| Interior Total | 9 | $38,500 | $121,500 | |
| Grand Total | 32 | $1,019,500 | $1,416,500 | |
Roof Replacement
Phase: 1 | Estimated Cost: $560,000
Roof replacement required to address cracked, spalled, and falling slate beyond its service life
Fire Escape
Phase: 1 | Estimated Cost: $560,000
New fire escape to replace existing corroded and bent metal fire escape (plus other fire or life safety hazards)
Hazardous Materials
Phase: 1 | Estimated Cost: $560,000
Actions to address potentially hazardous materials, including mold, lead and asbestos containing materials
Repair Railings
Phase: 1 | Estimated Cost: $560,000
Replacing disconnected or missing railings at building entrances
Water Management
Phase: 1 | Estimated Cost: $560,000
Actions to address the lack of water management system (gutters and downspouts)
Dormer Replacement
Phase: 1 | Estimated Cost: $560,000
Replacement of severely deteriorated dormer windows & siding
HVAC Repair & Upgrade
Phase: 1 | Estimated Cost: $560,000
Mechanical upgrades to address issues with the boiler and heat pump
Phase One: Roof and Dormer
Estimated to Begin: Late 2026
Estimated Cost: $715,000
Phase One focuses on securing the future of the House by addressing the most urgent structural needs. Replacing the aging roof, restoring the dormers, and making vital fire and life safety updates are critical first steps in preserving the building for generations to come. These improvements will ensure the House remains safe, watertight, and resilient against Maine’s challenging weather conditions.
- Replace roof
- Replace dormer windows & siding
- Fire & life safety updates
Phase 2: Deferred Maintenance
Timeline to Complete: To Be Determined
Estimated Cost: $685,000
Phase Two addresses the long-overdue maintenance needs that have accumulated over decades. These projects focus on removing hazardous materials, restoring essential building systems, and upgrading critical infrastructure. By investing in these improvements, we will protect the House’s structure, improve safety, and modernize its mechanical systems — ensuring the House remains a strong, sustainable home for many years to come.
- Removal of hazardous materials
- Replace and repair railings
- Repair water management systems (downspouts & gutters)
- Mechanical and HVAC repairs and upgrades
A long-standing impact for generations to come.
We know that brotherhood is more than just about our undergraduate experience – it’s also about the growth and leadership of the men who come after us.
Today, we have the opportunity to create a long-standing impact for the men who come after us – the men who are going to lead and create impactful change in our world.